BUILD DRIVEWAYS THAT LAST
At Dan's we carefully procure
quality materials that meet our high quality standards
and optimize the lifetime of driveways constructed by
Dan's Paving.

OUR
FOUR STEP PROCESS
To build a quality driveway,
proper time and attention to detail are required
throughout the four-step process:
STEP 1: Old blacktop, stone or
topsoil is removed and replaced with a layer of crushed
stone, known as sub-base.
STEP 2: The sub-base is then
compacted with a vibratory roller. After the
compaction process, a sub-base of 6 to 8 inches deep is
left. This material is applied directly on the
sub-soil surface.
STEP 3: A layer of binder
blacktop is added between the sub-base and the wearing
course (this is recommended for highly traveled
driveways and parking lots). The binder is then
compacted to a thickness of about two inches.
STEP 4: Finally, the wearing
coarse is applied and compacted. The thickness of
the asphalt can vary from 1 1/2 inches to 2 1/2 inches
depending on the binder course application.
Depending on weather
conditions your driveway will be cured and ready for use
within 1 to 3 days from completion.